leovegas mobile app|welcome /portfolio_category/k-12/ good experience builders Thu, 29 Aug 2019 20:10:10 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 /wp-content/uploads/2016/01/cropped-The-Bug-32x32.png leovegas mobile app|welcome /portfolio_category/k-12/ 32 32 leovegas mobile app|welcome /portfolio/pope-high-school/ /portfolio/pope-high-school/#respond Tue, 17 Apr 2018 16:14:29 +0000 /?post_type=avada_portfolio&p=2181 Winter completed an award-winning phased renovation and addition at Pope High School, including the addition of an 84,000 square-foot gymnasium and theater. The entire scope of the project, in addition to the new building and associated site work, included renovation work on the existing high school building and its athletic facilities. Winter installed new flooring [...]

The post Pope High School appeared first on Winter Construction.

]]>
Winter completed an award-winning phased renovation and addition at Pope High School, including the addition of an 84,000 square-foot gymnasium and theater. The entire scope of the project, in addition to the new building and associated site work, included renovation work on the existing high school building and its athletic facilities.

Winter installed new flooring throughout the existing high school, renovated the football, baseball, and softball amenities, and relocated the tennis courts. Winter also reconfigured classrooms into labs and converted an interior athletic area into an interactive distance learning classroom

Winter completed the initial renovations in time for the beginning of the fall term of 2016. The interior renovations in the existing school updated the weight room, art and graphic art rooms, engineering and technology room, and labs. The school remained in use during the construction. Winter completed the new auditorium and gymnasium at the end of 2017, in time for a girls and boys basketball doubleheader a few days after the new year.

The post Pope High School appeared first on Winter Construction.

]]>
/portfolio/pope-high-school/feed/ 0
leovegas mobile app|welcome /portfolio/atlanta-international-school/ Wed, 05 Jul 2017 17:28:29 +0000 /?post_type=avada_portfolio&p=1888 Winter expanded the soccer field at Atlanta International School (AIS), added a competition oval, and performed extensive site renovation to reconfigure parking areas and a playground. AIS is a private school in the historic Garden Hills District of Atlanta, with competitive soccer teams and track-and-field teams. AIS acquired land for additional parking and for reconfiguration [...]

The post Atlanta International School appeared first on Winter Construction.

]]>
Winter expanded the soccer field at Atlanta International School (AIS), added a competition oval, and performed extensive site renovation to reconfigure parking areas and a playground. AIS is a private school in the historic Garden Hills District of Atlanta, with competitive soccer teams and track-and-field teams. AIS acquired land for additional parking and for reconfiguration of its playing fields. Winter performed demolition and renovation of various separate areas of the campus while the campus remained occupied. Winter built several retaining walls for the reconfigured site and installed extensive underground stormwater detention systems.

 

The post Atlanta International School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/long-middle-school/ Wed, 05 Jul 2017 17:15:41 +0000 /?post_type=avada_portfolio&p=1883 Winter is building a new auditorium building, a three-story addition to an existing classroom wing, a renovation to the gym, and an addition to the administrative wing at this southeast Atlanta middle school. The construction is being accomplished on an active campus. The new auditorium and the new classroom addition add over 30,000 square feet [...]

The post Long Middle School appeared first on Winter Construction.

]]>

Winter is building a new auditorium building, a three-story addition to an existing classroom wing, a renovation to the gym, and an addition to the administrative wing at this southeast Atlanta middle school. The construction is being accomplished on an active campus. The new auditorium and the new classroom addition add over 30,000 square feet of space for the school. The new 300-seat auditorium will greatly improve the school’s performance and presentation capability. The total square footage of transformed administrative space will amount to over 8,000 square feet. Winter will also reconfigure and transform the main entrance, where the new auditorium will make a new face for the school.

The post Long Middle School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/boyd-elementary-school/ Wed, 05 Jul 2017 14:09:59 +0000 /?post_type=avada_portfolio&p=1877 Winter performed a complete renovation of this 80,000 square-foot elementary school on the west side of Atlanta. Winter also built a new school entrance and new bus drop-off canopy. This comprehensive renovation relocated exterior walls, reconfigured interior spaces, and replaced all of the existing stairwells to meet current building code requirements. Winter carried out reconfigurations in [...]

The post Boyd Elementary School appeared first on Winter Construction.

]]>
Winter performed a complete renovation of this 80,000 square-foot elementary school on the west side of Atlanta. Winter also built a new school entrance and new bus drop-off canopy. This comprehensive renovation relocated exterior walls, reconfigured interior spaces, and replaced all of the existing stairwells to meet current building code requirements. Winter carried out reconfigurations in the classroom area to enlarge the classrooms and renovated passageways to reduce grade changes. The renovation also included installing new finishes for floors and walls. Winter achieved notable successes in value engineering for the project. Creative solutions that Winter proposed included rearranging interior stair locations in lieu of adding new building square footage and changing interior partitions from masonry to framed walls – both proposals yielded significant savings in unnecessary structure modifications. The front entry canopy was also re-engineered from structural steel to aluminum, providing an overall savings of $100,000 in the canopy alone.

 

The post Boyd Elementary School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/maynard-jackson-high-school/ Tue, 27 Jun 2017 19:10:34 +0000 /?p=245 Winter completed the 280,000 square-foot structural renovation and new construction project at Maynard Jackson High School. The new construction consists of a mechanical addition, kitchen expansion, and new 16,000 square-foot gymnasium, which includes one performance court and two practice courts. The renovated main two-story classroom building was designed to hold 1,200 students and includes science [...]

The post Maynard Jackson High School appeared first on Winter Construction.

]]>
Winter completed the 280,000 square-foot structural renovation and new construction project at Maynard Jackson High School.

The new construction consists of a mechanical addition, kitchen expansion, and new 16,000 square-foot gymnasium, which includes one performance court and two practice courts.

The renovated main two-story classroom building was designed to hold 1,200 students and includes science and technology labs as well as standard classrooms. In order to accommodate the school’s new International Baccalaureate program, expanded music areas for the band and orchestra were constructed in addition to dance and drama rooms. Another intricate part of the renovation included remedial work of the existing green roof.

The post Maynard Jackson High School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/mvps-upper-school/ /portfolio/mvps-upper-school/#respond Tue, 16 May 2017 12:12:26 +0000 /?post_type=avada_portfolio&p=2245 Winter constructed the first phase of the 74,000 square-foot new high school building as a part of the new Glenn Upper School campus. The building is a four-level, post-tension concrete structure, with brick veneer, architectural exposed steel, metal roof and aluminum windows. The building houses spacious and naturally lit classrooms, science labs, art studios, choral [...]

The post Mount Vernon Presbyterian School Upper School appeared first on Winter Construction.

]]>
Winter constructed the first phase of the 74,000 square-foot new high school building as a part of the new Glenn Upper School campus.

The building is a four-level, post-tension concrete structure, with brick veneer, architectural exposed steel, metal roof and aluminum windows.

The building houses spacious and naturally lit classrooms, science labs, art studios, choral and band rooms, a cafeteria, a gymnasium that also serves as a performance venue, art gallery space, and a media center that overlooks a beautiful wooded ravine.

The project was constructed in accordance with the LEED® rating system. Aspects of the project which incorporated LEED® standards include a thermally reflective roof, bamboo gymnasium floor, and a unique geothermal system to heat and cool the building.

The Upper School is one of nine projects that Winter has completed for the school. Winter’s repeat work for Mt. Vernon Presbyterian School is a testament to the client’s overall satisfaction.

The post Mount Vernon Presbyterian School Upper School appeared first on Winter Construction.

]]>
/portfolio/mvps-upper-school/feed/ 0
leovegas mobile app|welcome /portfolio/cristo-rey-high-school/ Tue, 12 Jul 2016 20:42:16 +0000 /?post_type=avada_portfolio&p=937 This renovation marks the entry of the nationally branded Cristo Rey High School into the Atlanta market. Cristo Rey High School serves low-income students by giving them a college-prep education and work experience in a corporate office. The 39,000 square-foot building was the former location of the Roman Catholic Archdiocese of Atlanta headquarters and is [...]

The post Cristo Rey Jesuit High School appeared first on Winter Construction.

]]>

This renovation marks the entry of the nationally branded Cristo Rey High School into the Atlanta market. Cristo Rey High School serves low-income students by giving them a college-prep education and work experience in a corporate office.

The 39,000 square-foot building was the former location of the Roman Catholic Archdiocese of Atlanta headquarters and is located in the heart of Midtown, close to Marta transportation for easy accessibility.

The scope of work included demolition, abatement, and build-out of the building’s second floor, including 20 classrooms, a cafeteria, worship center, exercise room, locker rooms, and administrative offices. Sound walls were built throughout the space, and the mechanical and electrical systems were reconstructed to serve the new layout. New modern, code-compliant restroom stacks were added to each floor to accommodate the student body, and exit stairs were all brought up to code. The old VAT floor was first encapsulated and then covered with new flooring. All work was completed on a fast tracked schedule to open the school in time for the new school year.

The post Cristo Rey Jesuit High School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/woodmont-highschool/ Tue, 12 Jul 2016 13:54:06 +0000 /?post_type=avada_portfolio&p=786 Winter constructed this new high school in Greenville, South Carolina. With brick and sandblasted finishes and a modified bitumen roof, the new school is unique for school construction in that its entire structure is precast. The three-level 252,700 square-foot school has 80 classrooms, 10 laboratories, a full-service kitchen and cafeteria, theater, library, choral and orchestral rooms, [...]

The post Woodmont High School appeared first on Winter Construction.

]]>

Winter constructed this new high school in Greenville, South Carolina. With brick and sandblasted finishes and a modified bitumen roof, the new school is unique for school construction in that its entire structure is precast. The three-level 252,700 square-foot school has 80 classrooms, 10 laboratories, a full-service kitchen and cafeteria, theater, library, choral and orchestral rooms, auditorium, media production room, offices and faculty support areas, and enough parking for 645 vehicles. The state-of-the-art athletic facilities include three gymnasiums, locker rooms, football/track stadium, two baseball fields, two practice fields, and four tennis courts. Winter also performed sitework for the project, which included utility work, asphalt paving, and landscaping.

The post Woodmont High School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/westlake-highschool/ Tue, 12 Jul 2016 13:48:51 +0000 /?post_type=avada_portfolio&p=781 Winter constructed the new ground-up, 330,000 square-foot high school. The project team overcame multiple adverse conditions, including unforeseen subsurface conditions, unacceptable building pad provided by the Phase 1 construction contractor, and an extremely limited budget. The original contract construction schedule was 18 months, but Winter completed the school in an accelerated 16 month schedule. The existing site [...]

The post Westlake High School appeared first on Winter Construction.

]]>

Winter constructed the new ground-up, 330,000 square-foot high school. The project team overcame multiple adverse conditions, including unforeseen subsurface conditions, unacceptable building pad provided by the Phase 1 construction contractor, and an extremely limited budget. The original contract construction schedule was 18 months, but Winter completed the school in an accelerated 16 month schedule. The existing site conditions were not as shown on the contract documents, and significant rock was discovered during foundation excavation. Winter partnered with the subcontractors and re-sequenced the schedule to ensure on time delivery of the school. In addition, due to an extremely tight budget, the architect and Winter worked collaboratively to adapt the design and project finishes to offset the cost of unforeseen conditions.

The post Westlake High School appeared first on Winter Construction.

]]>
leovegas mobile app|welcome /portfolio/taylors-elementary-school/ Tue, 12 Jul 2016 13:45:51 +0000 /?post_type=avada_portfolio&p=776 Winter constructed the new two-story 99,000 square- foot elementary school for Greenville County Schools. Winter built the school adjacent to the existing elementary school. During construction the existing school remained in session. Following the completion of the new school, Winter managed the demolition of the existing school.

The post Taylors Elementary School appeared first on Winter Construction.

]]>

Winter constructed the new two-story 99,000 square- foot elementary school for Greenville County Schools. Winter built the school adjacent to the existing elementary school. During construction the existing school remained in session. Following the completion of the new school, Winter managed the demolition of the existing school.

The post Taylors Elementary School appeared first on Winter Construction.

]]>